IMPORTANT_Waukesha_Water_diversion_Links_from_e-mail-2020-02-21.txt Hello Fabi, It was a pleasure talking to you this morning and going to the public hearing with you on 8-20-2019 I have some main points here. The attachment is a letter written in 2014 to the federal United States Environmental Protection Agency (USEPA) from the Wisconsin Department of Natural Resources (DNR). Public comments on Waukesha Water diversion. Last day for Public Comments is Sept. 20, 2019 by writing by U.S. mail to: Geri Radermacher 141 NW Barstow St., Room 180, Waukesha, WI 53188 by email to: DNROEEACOMMENTS@WI.GOV, A main Page. https://dnr.wi.gov/topic/EIA/waukesha/DNRreview.html public permit review process very long. https://dnr.wi.gov/topic/EIA/waukesha/PermitsReview.html Department of Natural Resources Water Permit Application the whole application in many parts the photos and map at the end are interesting. https://permits.dnr.wi.gov/water/SitePages/DocSetView.aspx?DocSet=WP-IP-SE-2018-68-X12-21T15-22-55 There is candid correspondence back and forth on this page about between the United States EPA and the DNR about the permitting. These two letters are attached to this email as https://dnr.wi.gov/topic/EIA/waukesha/App2013.html or https://dnr.wisconsin.gov/topic/EIA/waukesha/App2013.html Wisconsin List of Impaired waters rivers: https://dnr.wi.gov/topic/impairedwaters/2018IR_IWList.html or https://dnr.wisconsin.gov/topic/surfacewater Page on Total Maximum Daily Loads (TMDL). https://dnr.wi.gov/topic/TMDLs/index.html or https://dnr.wisconsin.gov/topic/TMDLs -- David Fulwiler Milwaukee, Wisconsin 53233